Skip to main content
 

Belconnen Subsurface Wetlands

2024

Belconnen Subsurface Wetlands
Client | Construction Control
Budget | $4M

Description of works:

– Construction of sediment forebay, wetlands and subsurface wetlands
– Construction of stormwater system linking all ponds and wetlands together
– Installation of GPT structure
– Construction and installation of diversion structure
– Detailed planting works
– Hard and soft landscaping
– Construction of four metre wide maintenance path with handrails
– Construction of sediment forebay overflow structure

May | 2024

April | 2024