Sutton Road Stage 2

2017-18

Sutton Road Stage 2
Client
| Transport Canberra City Services
Budget | $3,850,000

Works | Drainage package with rectifying stormwater drainage throughout the length of road & pavement rehabilitation package which included rectification of pavement failed areas using methods such as deep lift pavement with stabilized base course as a bridging layer & deep lift asphalt plus also spray seal pavement correction layers. On top of this was pavement widening works in the shoulders & re-instalment of all disturbed areas with topsoiling & grassing methods.

June 2018

December 2017