Gungahlin Town Centre East Infrastructure

2017-19

Gungahlin Town Centre East Infrastructure
Client |  Suburban Land Agency (SLA)
Budget | $12M
Commenced | October 2017

Included works:

  • environmental protection measures
  • temporary traffic management
  • temporary erosion and sediment control measures
  • earthworks including cutting and controlled filling of blocks
  • stormwater pipes, stormwater ties, manholes, headwalls and sumps
  • subsoil drainage
  • sewer mains, sewer manholes and sewer ties
  • water supply mains and ties
  • common trenching for electricity, telecommunications and gas services
  • electrical, gas and telecommunications conduits and pits
  • road pavements, kerbs, driveways and footpaths
  • traffic control devices
  • street lighting
  • traffic lighting
  • fencing
  • reinstatement of disturbed areas
  • ancillary works
  • road crossing culverts
  • retaining walls and handrails
  • retarding basins and dispersion structures
  • tree planting – evergreen and deciduous
  • dryland grassing
  • planting for retarding basins

Awards

2019 | Master Builders Building Excellence Awards

June 2019 | Cord Civil was awarded the 2019 Building Excellence Award | Civil – Subdivision for Gungahlin Town Centre Infrastructure.

December 07 | 2018

October 30 | 2018

October 30 | 2018

July 18 | 2018

July 17 | 2018

July 02 | 2018

October 2017